OSIRIDE Work Plan
OSIRIDE is an 18 months project organized around 5 work packages, as follows:
Task 1. Project Management – includes all the activities managing the implementation of the project: monitoring and coordinating the different tasks, controlling and reporting. - complete
Task 2. Scenarios and Requirements Definition– the activities within this task focus on gathering the users requirements that will put the basis of OSIRIDE prototype development, The second objectives is to define the scenarios to demonstrate the implemented platform. - complete
Task 3. Algorithms Analysis, Implementation and Verification – within this task, all the existing algorithms will be analyzed and selected, and the still needed ones will be implemented and verified. - complete
Task 4. Prototype Design, Implementation, Verification and Deployment – the prototype will be designed, the algorithms will be integrated, the system will be verified and deployed. - complete
Task 5. Prototype Validation and Evaluation – foresees the necessary activities in order to test, validate and evaluate the prototype developed under the previous tasks. The independent testing represents the software validation and the evaluation provides a report on the outreach and potential, as well as a qualitative assessment of the developed solution. - ongoing
Deliverables:
PMP. Project Management Plan – delivered
UC – TN. Use Case and Scenarios - Technical Note – delivered
URD. Requirements Baseline - User Requirements – delivered
MAT – TN. Methods, Algorithms and Tools - Technical Note – delivered
TS – SRS. Technical Specification - Software Requirements Specification – delivered
SDD. Software design document – delivered
SRelD. Software release document – delivered
SUM. Software user manual – delivered
SVerP. Software verification plan – delivered
SValP. Software validation plan – delivered
SVerR. Software verification report – delivered
SValR. Software validation report – delivered
SRF. Software reuse file – delivered
SP. Software Package
ER. Evaluation Report
ES. Executive Summary
FP. Final Presentation
CCS. Contract Closure Summary
OSIRIDE prototype system
- OSIRIDE home page: http://osiride.terrasigna.com/
- Login using the following credentials:
- E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
- Password: gue$47@osi