eVADE Work plan

Task 1: Project Management (Terrasigna) includes the mandatory activities to ensure the smooth running of the project.

Task 2: Concept definition (UPB_CEOSpaceTech) contains the activities focused on requirements setting as a basis for concept development together with the application scenarios to be further used for validation and evaluation.

Task 3: Design and implementation (Terrasigna), within this task the selection and implementation of the algorithms will be performed, considering the modules described in the engineering approach.

Task 4: Integration and verification (Terrasigna) will cover the system integration, namely the interfacing of the software modules

Task 5: Test Validation and Evaluation (UPB_CEOSpaceTech) foresees the stages to be covered in order to test, validate and evaluate the concept developed